Garuda Maintenance Facilities Of Garuda Indonesia Soekarno-Hatta Airport Cengkareng
a.Perbaikan Metal Detector for Material at GMF, Department,Cengkareng.
b.
Perbaikan dan modifikasi Order Picker A and B.
c.Training on Operational and Basic Maintenance Order.
d.
Perbaikan dan modifikasi Viastore 10, 20 (Robotic for material handling).
e.Training on Operational and Basic Maintenance Order.






 
PT. SCHENEIDER INDONESIA JAKARTA
a.Revision on the Design of protective relaying System of relay SEPAM 1000 and SEPAM 2000.
b.Design and Mounting External Supply TVS III and TVS IV for SEPAM 1000 and 2000.
Deutsche Gesellschaft fur Technische Zusammenarbeit (GTZ) Gmbh
a.Making of Software of Inventory Control for 5 Universal Project.
b.Consultant of laboratory development of Technical and Basic sciences by GTZ.
c.Repair of Equipment of Chemical process laboratory at Syiah Kuala University, Banda Aceh.
 
Rothmans of Pall Mall Indonesia
a.Repair HAUNI LC WEIGHER UPGRADE Governor Office of East Java
b.Design and Making applied Software of Tender for faciliating Material and services for Governor office of east Java.
c.Design and Making applied Software and hardware for controlling incoming and out coming telephone call for Governor office of east Java
 
  PT. Eternit Gresik
- Design dan pembuatan peralatan cetak autoclave.
 

CV. PANRITA TEKNIK, MAKASAR
- Distributor DTF (Detektor Fasa) wilayah Makasar.

  CV. Laksana, Pati
- Setting da Operasional Meja Peneraan KWH Meter dgn kapasitas 64 KWH - Training Operasional Meja Peneraan KWH Meter dgn kapasitas 64 KWH
  CV. Maju Boulevard Jaya, Manado
- Setting da Operasional Meja Peneraan KWH Meter dgn kapasitas 64 KWH - Training Operasional Meja Peneraan KWH Meter dgn kapasitas 64 KWH
  CV. Naga Mas, Samarinda
- Setting da Operasional Meja Peneraan KWH Meter dgn kapasitas 64 KWH - Training Operasional Meja Peneraan KWH Meter dgn kapasitas 64 KWH
  CV. Alita.
- Pasang baru tower BTS di PLN APJ Kediri